A Metlen SOLAR pROJECT.
Overview & SUmmary
The project includes the installation of an array of photovoltaic panels with a maximum capacity of 30MWAC and the infrastructure will occupy approximately 93ha of land. The farm will include a site sub-station comprising a transformer, switch gear and protection equipment. The farm will consist of solar PV panels, steel racking and piled supports, inverter stations, electrical cabling, telecommunications equipment, an Operations and Maintenance Building, site substation and perimeter security fencing. The solar panels will be similar to those used for domestic applications and will operate as a single axis tracking system (SAT) which follows the sun during the course of the day to ensure optimal energy generation. The farm will consist of linear strings of mounted panels organised into blocks. Each block will connect to an inverter station that will convert the direct current (DC) energy into grid compatible alternating current (AC) energy. The generated electricity will be exported into the network through augmentation works to Essential Energy’s existing 66kV overhead transmission line that traverses the project site and runs through to the Junee Zone Substation.
Project STATUS
The construction of the solar farm is complete and operational
Project TIMELINE
- Development Commenced - Oct 2017
- Land Lease Signed – Feb 2020
- Construction Commenced Onsite – Mar 2020
- Target Completion – April 2021